COOLING TOWER SHRINK WRAPPING - BOISE, IDAHO
Protect staged equipment during outdoor storage and installation delays.

STORAGE EXPOSURE RISKS
1
RAIN & MOISTURE
Water entry through exposed openings

2
SNOW & ICE
Seasonal loading and freeze exposure
.jpg)
3
DIRT & SAND
Windblown particles entering equipment
.jpg)
4
DEBRIS & ROCK IMPACT
Loose material near active traffic

5
RODENT NESTING
Entry through unsealed openings
.jpg)
6
BEES & WASPS
Nesting inside exposed cavities
.jpg)
.jpg)
DIRT / GRIT IN OPENING
.jpg)
RODENT NESTING
.jpg)
BEES / WASPS NEST
ARRIVAL ENDS THE TRIP. PROTECTION CONTINUES.
Illustrative staging concept. Actual locations, access lanes and protection details require the project site plan and OEM review.

THE FINAL 100 FEET
FROM OUTDOOR STORAGE TO INSTALLATION

01
EXTENDED STORAGE
Wind damage
Trapped moisture
Pest entry
Inspect wrap, supports and openings.
Follow OEM preservation requirements.

02
FINAL MOVE & LIFT
Handling impact
Sling abrasion
Wrap tears
Inspect wrap, supports and openings.
Follow OEM preservation requirements.

03
INSTALLATION RELEASE
Premature unwrapping
Rain entry
Construction dust
Inspect wrap, supports and openings.
Follow OEM preservation requirements.

DOCUMENT EVERY HANDOFF.
Factory release
Carrier pickup
Arrival
Storage checks
Installation release
DELIVERED DOESN'T MEAN INSTALLED. PROTECTION CONTINUES.
Concept illustration. Follow OEM preservation requirements and the approved site lift plan.