


NATIONWIDE INDUSTRIAL PROTECTION WITH TRUSTED INDUSTRY PARTNERSHIPS
Based in Springfield, Massachusetts, Shrink Mobile Inc. provides nationwide industrial shrink wrap, stadium infrastructure protection, containment systems, weatherproofing, and specialized asset preservation solutions for transportation, energy, HVAC, construction, marine, and infrastructure projects throughout the United States.
Shrink Mobile crews support:
stadium infrastructure projects
rail transportation protection
HVAC equipment preservation
industrial containment systems
high-elevation access operations
commercial weatherproofing
rapid-response protection services

FIFA World Cup

Gillette Stadium

Gillette Stadium
Commonwealth Fusion Systems

Constellation Energy
.png)
Netflix

Oracle

Tesla

MBTA

CAF USA

Carrier

Gillette Stadium
“Logos represent prior project involvement, operational support, project experience, industry relationships, or associated work environments.”

FIFA CLEAN SITE PROJECT OVERVIEW
Shrink Mobile was selected to assist with specialized shrink wrap protection and infrastructure coverage connected to FIFA Clean Site preparation efforts at Gillette Stadium in Foxborough, Massachusetts.
The project involved:
crane basket operations
scissor lift access
high-elevation signage coverage
weather-sensitive scheduling
large-format stadium infrastructure protection
multi-contractor coordination
nighttime operations
wind and weather monitoring
The work required careful planning, specialized logistics, and safety-focused execution while operating in a high-profile stadium environment connected to one of the largest sporting events in the world.
WHY ORGANIZATIONS CHOOSE SHRINK MOBILE
01
Nationwide Deployment
Mobile crews capable of responding throughout the United States.
04
Fire-Retardant Protection Systems
Premium reinforced shrink films with UV inhibitors and engineered seam systems.
02
Industrial Asset Protection
Protection systems for transportation, infrastructure, HVAC, and commercial assets.
05
Rapid Response Logistics
On-site staging and deployment capabilities supporting large-scale projects.
03
High-Elevation Operations
Specialized experience operating in demanding elevated environments.
06
OSHA-Conscious Planning
Weather-sensitive operational planning focused on safety and coordination.
OUR PROFESSIONAL SHRINK WRAP PROCESS
A Proven System. Superior Protection.

01
PREP UNIT
We start by cleaning the unit and inspecting all surfaces. Loose debris, dust, and contaminants are removed to ensure the best seal and finish.

04
PULL WRAP OVER THE UNIT
Our industrial-grade shrink wrap film is carefully pulled over the unit, ensuring complete coverage on all sides and top.

07
SEAL PENETRATIONS
AND OPENINGS
All penetrations, vents, and openings are sealed with welded patches to prevent moisture, dust, and contaminants from entering.

02
PADDING ON ALL STRESS POINTS
High-density foam padding is applied to all sharp edges, corners, and protrusions to prevent abrasion and puncture of the shrink wrap.

05
WELD THE SEAM
The overlapping seams are heat welded together to create a permanent, airtight seal that will not peel or come apart over time.

08
FINAL INSPECTION & QUALITY CHECK
We complete a thorough inspection to ensure every detail is sealed and secured to our high standards before we consider the job complete.

03
TAPE ON ALL STRESS POINTS
Reinforced tape is applied over all padding and stress points to secure the padding in place and create a smooth surface for wrapping.

06
HEAT SHRINK TO TIGHTEN
We use professional heat equipment to shrink the film tight, conforming to the shape of the unit for maximum protection and durability.

SPECIALTY PROJECTS & NATIONAL RECOGNITION
Shrink Mobile also provided specialized protective coverage connected to the first-ever Tesla CyberBeast military truck showcased at SEMA in Las Vegas, demonstrating the company’s involvement in nationally recognized specialty projects requiring precision logistics, presentation-quality protection, and large-scale asset preservation.
SAFETY, LOGISTICS & WEATHER COORDINATION
Projects involving elevated stadium infrastructure require constant coordination involving:
wind monitoring
scissor lift access
safety communication
multi-contractor coordination
crane operations
weather delays
logistics scheduling
Shrink Mobile incorporates OSHA-conscious operational planning and weather-sensitive scheduling practices when performing high-access infrastructure protection services.

NATIONWIDE COVERAGE
Shrink Mobile provides nationwide industrial shrink wrap and infrastructure protection services throughout:
Massachusetts • Connecticut • Rhode Island • Vermont • New Hampshire • Maine • New York • New Jersey • Pennsylvania • Nationwide

NATIONWIDE INDUSTRIAL SHRINK WRAP & INFRASTRUCTURE PROTECTION
From stadium infrastructure and transportation equipment to HVAC systems and industrial containment, Shrink Mobile provides nationwide asset protection solutions for organizations requiring professional-grade coverage, rapid deployment, and specialized operational support.

_PNG.png)


















